JOURNAL HOME CME HOME THIS MONTH PAST ISSUES ETOC COLLECTIONS
AUTHORS REVIEWERS EDITORIAL BOARD FEEDBACK RSS HELP
A&A International Anesthesia Research Society
 QUICK SEARCH:   [advanced]


     


Anesth Analg 2008; 106:215-226
© 2008 International Anesthesia Research Society
doi: 10.1213/01.ane.0000289641.92927.b9
This Article
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a colleague
Right arrow Similar articles in this journal
Right arrow Similar articles in ISI Web of Science
Right arrow Similar articles in PubMed
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Citing Articles
Right arrow Citing Articles via HighWire
Right arrow Citing Articles via ISI Web of Science (1)
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Wachtel, R. E.
Right arrow Articles by Dexter, F.
Right arrow Search for Related Content
PubMed
Right arrow PubMed Citation
Right arrow Articles by Wachtel, R. E.
Right arrow Articles by Dexter, F.
Related Collections
Right arrow Operating Rooms
Right arrow Economics and Health Care Research


ECONOMICS, EDUCATION, AND POLICY

Tactical Increases in Operating Room Block Time for Capacity Planning Should Not Be Based on Utilization

Ruth E. Wachtel, PhD, MBA*, and Franklin Dexter, MD, PhD{dagger}

From the Departments of *Anesthesia and {dagger}Anesthesia and Health Management and Policy, University of Iowa, Iowa City, Iowa.

Address correspondence to Franklin Dexter, MD, PhD, Division of Management Consulting, Department of Anesthesia, University of Iowa, Iowa City, IA 52242. Address e-mail to Franklin-Dexter{at}UIowa.edu. Website www.FranklinDexter.net.

Abstract

When a decision has been made to expand operating room (OR) capacity, the choice of surgical subspecialties to receive additional block time and fill the additional OR capacity is a tactical decision. Such decisions are made approximately once a year. Afterwards, typically a few months before the day of surgery, a second stage occurs in which operational decisions allocate OR time and determine the hours of staffing for each specialty based on its expected workload. In practice, cases are not scheduled into block time that has been planned tactically, but instead are scheduled during the second stage into the staffed time that is allocated operationally. This article reviews the literature on tactical decision-making for expansion of OR capacity. When additional OR capacity is available, it should be planned for those subspecialties that have the greatest contribution margin per OR hour, that have the potential for growth, and that have minimal need for limited resources such as intensive care unit beds. Numerous reasons are presented to explain why tactical planning of additional block time should not be based on current or past utilization of block time.




This article has been cited by other articles:


Home page
Anesth. Analg.Home page
D. Masursky, F. Dexter, C. E. O'Leary, C. Applegeet, and N. A. Nussmeier
Long-Term Forecasting of Anesthesia Workload in Operating Rooms from Changes in a Hospital's Local Population Can Be Inaccurate
Anesth. Analg., April 1, 2008; 106(4): 1223 - 1231.
[Abstract] [Full Text] [PDF]




Lippincott, Williams & Wilkins Anesthesia & Analgesia® is published for the International Anesthesia Research Society® by Lippincott Williams & Wilkins with the assistance of Stanford University Libraries' HighWire Press®. Copyright 2006 by the International Anesthesia Research Society. Online ISSN: 1526-7598   Print ISSN: 0003-2999 HighWire Press
Copyright © 2008 by the International Anesthesia Research Society.